Generate string from a token array by interpolating values.
Test if an input value is a supported ndarray mask index data type.
Tokenize a string into an array of string parts and format identifier objects.
C APIs for registering a Node-API module exporting an interface for invoking a unary numerical function.
Test if an input value is a supported ndarray struct data type.
Test if a double-precision floating-point numeric value is NaN.
Test if a double-precision floating-point numeric value is infinite.
Resolve a loop block size for multi-dimensional array tiled loops.
Resolve the output ndarray data type for a binary function.
Multiply a double-precision floating-point number by an integer power of two.
Return an integer corresponding to the unbiased exponent of a double-precision floating-point number.
Convert a double-precision floating-point number to the nearest single-precision floating-point number.
Convert a scalar value to a zero-dimensional ndarray.
Apply a binary callback to elements in input ndarrays and assign results to elements in an output ndarray.
Return an unsigned 32-bit integer corresponding to the more significant 32 bits of a double-precision floating-point number.
Compute the absolute value of a double-precision floating-point number.
Return a double-precision floating-point number with the magnitude of x and the sign of y.
Natural logarithm of the gamma function.
Round a double-precision floating-point number toward zero.
Return an unsigned 32-bit integer corresponding to the IEEE 754 binary representation of a single-precision floating-point number.
Reorder ndarray dimensions and associated strides for loop interchange.
Exponential function.
List of ndarray data types.
Test if a value is ndarray-like.