Relative error exponential.
This is the macOS arm64 binary for Bun, a fast all-in-one JavaScript runtime.
The windows-arm64 binary for turbo, a monorepo build system.
Test if a number is prime.
The Windows 32-bit binary for esbuild, a JavaScript bundler.
Calculate the sum of single-precision floating-point strided array elements, ignoring NaN values and using an improved Kahan–Babuška algorithm.
Compute the reciprocal square root of a single-precision floating-point number.
Reusable Riddle Proof contracts and helpers for evidence-backed agent changes.
Sample elements from an array-like object.
Take elements from a two-dimensional nested array.
Take elements from a three-dimensional nested array.
https://docs.rs/lzma-rs binding to Node.js via https://napi.rs
Oxc Resolver Node API
Fast base encoding / decoding of any given alphabet
Test if two arrays have respective elements which are approximately the same value within a specified number of ULPs (units in the last place).
C APIs for registering a Node-API module exporting an interface for invoking a quinary numerical function.
Perform a multiply-add operation involving three double-precision complex floating-point numbers.
The NetBSD ARM 64-bit binary for esbuild, a JavaScript bundler.
Rayleigh distribution median.
This package defines the foundational TypeScript types of the Wallet Standard, and so provides a practical specification of the Wallet Standard until a formal specification may be completed.
https://linux.die.net/man/2/nice binding for Node.js
Convert from one base to another: Hex, Binary, Decimal, Octal
Apple's property list parser/builder for Node.js and browsers
Common utilities for products from Peculiar Ventures